Plus:SummaryPreparingACalculation: Unterschied zwischen den Versionen
Aus Wufiwiki
Zur Navigation springenZur Suche springen
Tes (Diskussion | Beiträge) (Die Seite wurde neu angelegt: Overview of the steps that have to be taken before starting a calculation: * First your can enter some optional information about project and case * Then you may sele...) |
Tes (Diskussion | Beiträge) Keine Bearbeitungszusammenfassung |
||
(2 dazwischenliegende Versionen desselben Benutzers werden nicht angezeigt) | |||
Zeile 1: | Zeile 1: | ||
Overview of the steps that have to be taken before starting a calculation: | Overview of the steps that have to be taken before starting a calculation: | ||
* First | * First you can enter some optional information about [[Plus:Dialog Project | project]] and [[Plus:Dialog Case | case]] | ||
* Then you may select the location of the | * Then you may select the location of the project for a specific [[Plus:Dialog Climate | climate file]]. Further you can define some [[Plus:Dialog Climate | optional climate]] | ||
* You have to edit the building | * You have to edit the building either with the [[Plus:DialogBuildingWizard#Automatic building wizard | automatic building wizard]] or a [[Plus:DialogBuildingWizard#Automatic building wizard | script file]]. Edit measures, shape and orientation of the building | ||
* You may assign assemblies to the components of the building | * You may assign [[Plus:Dialog Assembly | assemblies]] to the components of the building | ||
* If needed fit | * If needed, fit [[Plus:Dialog DatabaseWindows | windows]] in the components and assign the window type | ||
* You have to specify the inner climate | * You have to specify the [[Plus:TreeInnerClimate | inner climate]] by defining the temperatures, the relative humdities, the CO<sub>2</sub> concentrations and the ventilation | ||
* You may qoute the loads from accupancy or additional | * You may qoute the [[Plus:TreeLoads | loads]] from accupancy or additional | ||
* Then enter the equipment data about heating, cooling and ventilation system | * Then enter the [[Plus:TreeEquipment | equipment data]] about heating, cooling and ventilation system | ||
* Now other | * Now [[Plus:OtherParameters | other parameters]] like the initial room conditions or the accuracy of calculation have to be set | ||
* At least the attached zones have to be specified | * At least the [[Plus:Dialog AttachedZones | attached zones]] have to be specified | ||
* When all inputs are done and the State of input data shows green, the calulation can be started | * When all inputs are done and the State of input data shows green, the calulation can be started |
Aktuelle Version vom 8. Juli 2009, 11:10 Uhr
Overview of the steps that have to be taken before starting a calculation:
- Then you may select the location of the project for a specific climate file. Further you can define some optional climate
- You have to edit the building either with the automatic building wizard or a script file. Edit measures, shape and orientation of the building
- You may assign assemblies to the components of the building
- If needed, fit windows in the components and assign the window type
- You have to specify the inner climate by defining the temperatures, the relative humdities, the CO2 concentrations and the ventilation
- You may qoute the loads from accupancy or additional
- Then enter the equipment data about heating, cooling and ventilation system
- Now other parameters like the initial room conditions or the accuracy of calculation have to be set
- At least the attached zones have to be specified
- When all inputs are done and the State of input data shows green, the calulation can be started