Overview of the steps that have to be taken before starting a calculation:
Overview of the steps that have to be taken before starting a calculation:


* First your can enter some optional information about project and case
* First you can enter some optional information about [[Plus:Dialog Project | project]] and [[Plus:Dialog Case | case]]


* Then you may select the location of the to calculate project fpr a specific climate file. Further you can define some optional climate
* Then you may select the location of the project for a specific [[Plus:Dialog Climate | climate file]]. Further you can define some [[Plus:Dialog Climate | optional climate]]


* You have to edit the building wither with the automatik building wizard or a script file. Edit measures, shape and orientation
* You have to edit the building either with the [[Plus:DialogBuildingWizard#Automatic building wizard | automatic building wizard]] or a [[Plus:DialogBuildingWizard#Automatic building wizard | script file]]. Edit measures, shape and orientation of the building


* You may assign assemblies to the components of the building
* You may assign [[Plus:Dialog Assembly | assemblies]] to the components of the building


* If needed fit in windows in the components and assign the window type
* If needed, fit [[Plus:Dialog DatabaseWindows | windows]] in the components and assign the window type


* You have to specify the inner climate with defining the temperatures, the relative humdities, the CO<sub>2</sub> concentrations and the ventilation  
* You have to specify the [[Plus:TreeInnerClimate | inner climate]] by defining the temperatures, the relative humdities, the CO<sub>2</sub> concentrations and the ventilation  


* You may qoute the loads from accupancy or additional
* You may qoute the [[Plus:TreeLoads | loads]] from accupancy or additional


* Then enter the equipment data about heating, cooling and ventilation system
* Then enter the [[Plus:TreeEquipment | equipment data]] about heating, cooling and ventilation system


* Now other parametrs like the initial room conditions or the accuracy of calculation have to be set
* Now [[Plus:OtherParameters | other parameters]] like the initial room conditions or the accuracy of calculation have to be set


* At least the attached zones have to be specified
* At least the [[Plus:Dialog AttachedZones | attached zones]] have to be specified


* When all inputs are done and the State of input data shows green, the calulation can be started
* When all inputs are done and the State of input data shows green, the calulation can be started

Aktuelle Version vom 8. Juli 2009, 11:10 Uhr

Overview of the steps that have to be taken before starting a calculation:

  • First you can enter some optional information about project and case
  • You may assign assemblies to the components of the building
  • If needed, fit windows in the components and assign the window type
  • You have to specify the inner climate by defining the temperatures, the relative humdities, the CO2 concentrations and the ventilation
  • You may qoute the loads from accupancy or additional
  • Then enter the equipment data about heating, cooling and ventilation system
  • Now other parameters like the initial room conditions or the accuracy of calculation have to be set
  • When all inputs are done and the State of input data shows green, the calulation can be started