Passive:Menu and Dialogues: Unterschied zwischen den Versionen

Aus Wufiwiki
Zur Navigation springenZur Suche springen
Zeile 57: Zeile 57:
*'''View''': Direct link to the view properties menu.<BR>
*'''View''': Direct link to the view properties menu.<BR>
*'''Edit Data''':
*'''Edit Data''':
*'''Google Sketchup Add-On''': Installation tool of the Sketchup® Add-On<br>
*'''WUFI®Plus Plug-In into Google Sketchup''': Self-explanatory<br>
&nbsp;<BR>
&nbsp;<BR>



Version vom 29. Mai 2013, 14:35 Uhr

Overview on WUFI®' Passive's Menu Bar and Dialog Structure

This list contains a description of all menu items and of all dialogs, including dialogs which are not directly accessible via the menus, but as sub-dialogs of other dialogs:

Passive-menubar.png


File:

Passive-menu file.png

  • New Project

Wipes WUFI®'s memory clean and starts a new, empty project.
The project dialog opens and allows you to give a name to the project and serves as a memo pad for some administrative project information.

  • Open

Displays the usual 'Open' dialog from which you can open existing project files (which contain the input data and the calculation results, if any).

  • Reopen

Displays a list of projects you previously worked with so that you can easily open them by simply selecting them from this list.

  • Save

Saves the input data and (after a calculation has been performed) the calculation results to the project file.
You should save the project before a calculation in case something goes wrong; you must save again after the calculation if you want to keep the results for later use.

  • Save As...

Saves the current project under a new name. The old project file, if existing, continues to exist under the old name.

  • Exit

Closes WUFI®plus. But why should you want to?
 

Inputs:

Passive-menu input.png

This menu enables fast navigation as clicking on one of the items (Project, Case, Climate,Building, HVAC) makes the program jump to the corresponding entry in the Navigation Tree


  • Project
    Here you define all information of the project, including the name and address of the client and special remarks concerning the project.
  • Case 1
    Here you define general information about the project and the time of calculation. Additional the button results shows the report of the calculation which is available after the calculation.
  • Climate
    This dialog serves to specify the weather acting on the outer boundaries of the building.
    It is possible to define a typical external climate or an optional climate.
  • Building
    On this page you can find the building wizard which helps you to design the building dimensions. And by clicking on this item the zones and attached zones get visible when the building is designed.
  • HVAC
    This dialog includes the input mask for all data concerning the HVAC-System.

 

Options:

Passive-menu options.png

  • General: Setting of program colors, user information and program view properties.
  • Colors: Direct link to the color setting menu.
  • View: Direct link to the view properties menu.
  • Edit Data:
  • WUFI®Plus Plug-In into Google Sketchup: Self-explanatory

 

Database:

Passive-menu database.png

 

 

 

 

Help:

P2-Menu Help.png

About WUFI
Displays information about WUFI®plus, including the version number.

Tool Bar

The following menu items are also available via the toolbar buttons:

ToolbarNewProject.gif Create New Project

ToolbarOpenProjectFile.gif Open Project File

ToolbarSaveProjectFile.gif Save Project File