Plus:SummaryPreparingACalculation

Aus Wufiwiki
Version vom 8. Juli 2009, 11:10 Uhr von Tes (Diskussion | Beiträge)
(Unterschied) ← Nächstältere Version | Aktuelle Version (Unterschied) | Nächstjüngere Version → (Unterschied)
Zur Navigation springenZur Suche springen

Overview of the steps that have to be taken before starting a calculation:

  • First you can enter some optional information about project and case
  • You may assign assemblies to the components of the building
  • If needed, fit windows in the components and assign the window type
  • You have to specify the inner climate by defining the temperatures, the relative humdities, the CO2 concentrations and the ventilation
  • You may qoute the loads from accupancy or additional
  • Then enter the equipment data about heating, cooling and ventilation system
  • Now other parameters like the initial room conditions or the accuracy of calculation have to be set
  • When all inputs are done and the State of input data shows green, the calulation can be started